North-West Logistic Park, 67.300 m², 824.000 m³
Location:
Szczecin, Poland
The complex of 5 halls in steel structure. All constructed on embankment construction made with high ground water level.
The infrastructure: sett’s surface , transformer stadion, water and sewage drain system, fire water pumping station with a water tank of 1,000 m³, evaporate and drainage tank for rainwater.
Hall A - 6.830 m² i 85.000 m³
Execution time: 7 months, since 11.2012 to 05.2013
Hall B - 13.282 m² i 165.360 m³
Execution time: 9 months, since 09.2013 to 05.2014
Hall C - 28.542 m² i 355.347 m³
Execution time: 7 months, since 11.2014 to 05.2015
Hall D - 13.986 m² i 165.410 m³
Execution time: 9 months, since 06.2014 to 03.2015
Hall E - 4.680 m² i 52.416 m³
Execution time: 8 months, since 06.2015 to 01.2016